top of page
LIST OF PROJECTS
Filter by Nature of Works
SHOWING 304 NUMBERS OF PROJECTS
PROJECT NAME | CLIENT | YEAR |
|---|---|---|
STRUCTURAL ASSESSMENT, DESIGN AND REPAIR / STRENGTHENING OF DAMAGED PIERS AT BRIDGE OVER PARLIMEN ROUNDABOUT | KI INTEGRATED CONSULTANTS SDN BHD | 2015 |
LEBUHRAYA SUNGAI BESI (BESRAYA) - GENERAL INSPECTION OF BRIDGES ALONG BESRAYA HIGHWAY YEAR 2015 | BESRAYA (M) SDN BHD | 2015 |
REPAIR OF CRACKED RETAINING WALL AT 006/30SN AND 006/70SN ALONG LEBUHRAYA KEMUNING-SHAH ALAM (LKSA) FOR PROJEK LINTASAN SHAH ALAM SDN BHD - SUPERVISION | TURNPIKE SYNERGY SDN BHD | 2015 |
INTEGRATED ASSET MANAGEMENT SYSTEM FOR JAMBATAN SULTAN ABDUL HALIM MU'ADZAM SHAH | GAMMERLITE SDN BHD | 2015 |
CADANGAN PENAMBAHBAIKAN 'SISTEM PENGURUSAN JAMBATAN' (2014/G037) | DEWAN BANDARAYA KUALA LUMPUR | 2015 |
FULL-TIME SUPERVISION FOR THE REPAIR OF CRACKS AT PIER EW91 AT AMPANG-KUALA LUMPUR ELEVATED HIGHWAY FOR PROJEK LINTASAN KOTA SDN BHD | TURNPIKE SYNERGY SDN BHD | 2015 |
PROPOSAL FOR MAINTENANCE OF FEDERAL ROADS IN PENINSULAR MALAYSIA | NAZA ENGINEERING & CONSTRUCTION SDN BHD | 2015 |
MENYIAPKAN BAKI KERJA TERTINGGAL BAGI PROJEK MEMBINA JALAN BARU DARI LEBUHRAYA SEREMBAN-PORT DICKSON KE LALUAN 5 DI PASIR PANJANG DAN MENAIKTARAF LALUAN 5 DARI PASIR PANJANG KE LINGGI, NEGERI SEMBILAN DARUL KHUSUS - ASSESSMENT & DESIGN REPAIR OF BRIDGE OVER SG. MENYALA | FORAR ENGINEERING SDN BHD / INFRA TEGUH SDN BHD | 2015 |
INSPECTION OF VEHICULAR BOX CULVERTS (VBC) ALONG LEBUHRAYA KEMUNING-SHAH ALAM SDN BHD | TURNPIKE SYNERGY SDN BHD | 2015 |
CONDITION ASSESSMENT OF PENCHALA TUNNEL ON SKIM PENYURAIAN TRAFIK KL BARAT (SPRINT) | SISTEM PENYURAIAN TRAFIK KL BARAT SDN BHD | 2015 |
DETAILED INSPECTION AND DESIGN FOR REPAIR OF CRACKS AT PIERS WE59 AND WE91 ALONG AMPANG-KUALA LUMPUR ELEVATED HIGHWAY (AKLEH) | TURNPIKE SYNERGY SDN BHD | 2014 |
THE DETAILED INSPECTION & ASSESSMENT OF AN EXISTING BRIDGE OVER SG. KELANG, LOCATED ALONG JALAN JELATEK, KUALA LUMPUR | RANHILL CONSULTING SDN BHD | 2014 |
bottom of page

