top of page
LIST OF PROJECTS
Filter by Nature of Works

SHOWING 304 NUMBERS OF PROJECTS

PROJECT NAME
CLIENT
YEAR
DETAILED INSPECTION AND DESIGN FOR REPAIR OF CRACKS AT SELECTED PIERS/ABUTMENTS ALONG AMPANG-KUALA LUMPUR ELEVATED HIGHWAY
TURNPIKE SYNERGY SDN BHD
2013
A COMPREHENSIVE STUDY ON THE VIBRATION OF HIGHWAY BRIDGES
JABATAN KERJA RAYA
2013
LEBUHRAYA SUNGAI BESI (BESRAYA) GENERAL INSPECTION OF BRIDGES ALONG BESRAYA HIGHWAY YEAR 2012
BESRAYA (M) SDN BHD
2013
PROPOSED STRENGTHENING FOR SG. SEBAYA BRIDGE, SIBU, SARAWAK
KI INTEGRATED CONSULTANTS SDN BHD
2013
REPAIR OF CRACKED RETAINING WALL AT 006/30SN AND 006/70SN ALONG LEBUHRAYA KEMUNING-SHAH ALAM (LKSA) FOR PROJEK LINTASAN SHAH ALAM SDN BHD - DESIGN
TURNPIKE SYNERGY SDN BHD
2013
INDEPENDENT STRUCTURAL AUDIT FOR BRIDGE OVER SG. MERBAU
ENDEAVOUR CONSULT SDN BHD
2013
PROPOSED BRIDGE CONDITION ASSESSMENT ALONG KUALA LUMPUR - KARAK HIGHWAY, EAST COAST EXPRESSWAY PHASE 1 AND KUALA LUMPUR - SEREMBAN EXPRESSWAY
TERRATECH CONSULTANTS (M) SDN BHD
2013
CONDITION ASSESSMENT OF GENTING SEMPAH TUNNEL AT KUALA LUMPUR - KARAK HIGHWAY
TERRATECH CONSULTANTS (M) SDN BHD
2013
HYROLOGICAL DESIGN & ANALYSIS FOR BRIDGE AT PROPOSED ACCESS ROAD FROM JALAN TUN RAZAK (NORTH)
TURNPIKE SYNERGY SDN BHD
2013
AMPANG - KUALA LUMPUR ELEVATED HIGHWAY (AKLEH), SUPERVISING CONSULTANT FOR PROPOSED CONSTRUCTION AND COMPLETION OF ACCESS ROAD FROM JALAN TUN RAZAK TO AKLEH VIA RAMP JTR 3 FOR PROJEK LINTASAN KOTA SDN BHD
TURNPIKE SYNERGY SDN BHD
2013
LEBUHRAYA PANTAI BARU (NPE:E10) GENERAL INSPECTION OF BRIDGES ALONG NEW PANTAI EXPRESSWAY YEAR 2012
NEW PANTAI EXPRESSWAY SDN BHD
2013
INSPECTION OF BRIDGES ALONG GUTHRIE CORRIDOR EXPRESSWAY FOR PROJEK LINTASAN KOTA SDN BHD EXPRESSWAY SDN. BHD. YEAR 2013
TURNPIKE SYNERGY SDN BHD
2013

©2025 by Evenfit Consult Sdn. Bhd

bottom of page