top of page
LIST OF PROJECTS
Filter by Nature of Works
SHOWING 307 NUMBERS OF PROJECTS
PROJECT NAME | CLIENT | YEAR |
|---|---|---|
PRIVATISATION OF THE METRAMAC HIGHWAY - CARRY OUT DESIGN, TENDERING & SUPERVISION OF BRIDGE NO.6, REPAIR WORKS ALONG KL-SEREMBAN EXPRESSWAY | METRAMAC CORPORATION SDN BHD | 2011 |
PROPOSED STRUCTURAL ASSESSMENT AND RECTIFICATION WORKS FOR SLAG/FERTILIZER TERMINAL JETTY AT DRY BULK TERMINAL 2 (DBT2) AT WESTPORTS, PULAU INDAH, PORT KLANG, SELANGOR DARUL EHSAN | HSS INTEGRATED SDN BHD | 2011 |
BRIDGE INSPECTION TRAINING FOR PERBADANAN PUTRAJAYA | EKUITI UTARA SDN BHD | 2011 |
KUALA LUMPUR-SEREMBAN HIGHWAY, STITCHING OF DECK SLAB FOR BRIDGE 3, 4 & 5 | TERRATECH CONSULTANTS (M) SDN BHD | 2011 |
I)INVESTIGATION OF CRACKS AT PUCHONG JAYA INTERCHANGE II)INVESTIGATION AND DESIGN OF REMEDIAL SOLUTION FOR CRACKS AT PIER 4 MOTOROLA INTERCHANGE BRIDGE | LINGKARAN TRANS KOTA SDN BHD | 2011 |
DESIGN OF ABUTMENT AND PILE FOR CADANGAN PEMBINAAN PERUMAHAN UMK JELI, KELANTAN | K&N CONSULTING ENGINEERS SDN BHD / ZNK CONSULT SDN BHD | 2011 |
STRUCTURAL INTEGRITY ASSESSMENT OF THE PIER CROSSHEAD AND SUPERSTRUCTURE AT VIADUCT ON FEDERAL ROUTE OB028 KM33.2 MIDDLE RING ROAD (MRR2), CHERAS, KUALA LUMPUR | KI INTEGRATED CONSULTANTS SDN BHD | 2011 |
EAST COAST EXPRESSWAY PHASE 1 : REPAIR OF BRIDGE KM 191.60EB AND KM 191.60WB OVER SG. BAKAPOR ALONG EAST COAST EXPRESSWAY PHASE 1 | TERRATECH CONSULTANTS (M) SDN BHD | 2011 |
KAJIAN ASSESSMENT OF BRIDGE CAPACITY DI SABAH, SARAWAK & LABUAN | KUMPULAN IKRAM SDN BHD | 2011 |
BRIDGE DESIGN FOR MAIS PROJECT AT SERENDAH | K&N CONSULTING ENGINEERS SDN BHD / JURUTEK CONSULTANTS | 2011 |
PROPOSED REPAIR OF DAMAGED RETAINING WALL AT 001/10 MLEB (SEGMENT 53-RIGHT WALL) | PROJEK LINTASAN KOTA SDN BHD | 2011 |
REVIEW OF CONTRACTOR'S METHOD STATEMENT FOR CRACK INSPECTION OF PUCHONG JAYA & TTDI BRIDGE INTERCHANGE | LINGKARAN TRANS KOTA SDN BHD | 2011 |
bottom of page

