top of page
LIST OF PROJECTS
Filter by Nature of Works
SHOWING 307 NUMBERS OF PROJECTS
PROJECT NAME | CLIENT | YEAR |
|---|---|---|
CONDUCT STRUCTURAL INTEGRITY INSPECTION AT VIADUCT 1,2,3 AND 4, KUALA LUMPUR - KARAK HIGHWAY | TERRATECH CONSULTANTS (M) SDN BHD | 2019 |
PERKHIDMATAN MENYEMAK DAN MENGEMASKINI HYDROLOGICAL PROCEDURE (HP) NO. 10 : STAGE - DISCHARGE CURVES (1977) DAN NO. 19 : DETERMINATION OF SUSPENDED SEDIMENT DISCHARGE (1977) BAGI PROGRAM MEMPERKASA DATA DAN RANGKAIAN STESEN HIDROLOGI NASIONAL (RHN) - FASA 1 | JABATAN PENGAIRAN DAN SALIRAN | 2019 |
E25:KL-KUALA SELANGOR EXPRESSWAY (LATAR) - PRINCIPLE BRIDGE AND CULVERT INSPECTION AT KL-KUALA SELANGOR EXPRESSWAY (LATAR) | KL-KUALA SELANGOR EXPRESSWAY BERHAD | 2019 |
INSPECTION & ASSESSMENT OF STRUCTURE FOR SEGMENTAL BOX GIRDERS ALONG MAJU EXPRESSWAY SDN BHD (MEX) FOR A YEAR 2019 | MAJU EXPRESSWAY SDN BHD | 2019 |
CONSULTANCY / SPECIALIST SERVICES TO CARRY OUT PRINCIPAL BRIDGE INSPECTION AND MONITORING AT KAJANG SILK HIGHWAY FOR SISTEM LINGKARAN LEBUHRAYA KAJANG SDN BHD | SISTEM LINGKARAN LEBUHRAYA KAJANG SDN BHD | 2019 |
AMPANG-KUALA LUMPUR ELEVATED HIGHWAY ("AKLEH") FULLTIME SUPERVISION FOR REPAIR OF CRACKS AT PIER WE 57, JTR/1/9 AND SELECTED ANCHORAGE BLOCKS INSIDE BOX GIRDER ALONG AMPANG-KUALA LUMPUR ELEVATED HIGHWAY (AKLEH) FOR PROJEK LINTASAN KOTA SDN BHD ("SERVICES) | TURNPIKE SYNERGY SDN BHD | 2019 |
CONSULTANCY / SPECIALIST SERVICES TO CARRY OUT BRIDGE INSPECTION AND MONITORING AT AMPANG-KUALA LUMPUR ELEVATED HIGHWAY (AKLEH) FOR PROJEK LINTASAN KOTA SDN BHD | TURNPIKE SYNERGY SDN BHD | 2019 |
REHABILITATION, UPGRADING OF TRACK AND ASSOCIATED WORKS BETWEEN GEMAS, NEGERI SEMBILAN TO MENTAKAB RAILWAY STATION | HIKMAT ASIA SDN BHD | 2019 |
PROPOSAL FOR REPLACEMENT OF BEARINGS AT ABUTMENT A OF BRIDGE E8/54/75WB ALONG KL-KARAK HIGHWAY | SYSTEM BUILDERS MAINTENANCE SERVICES SDN BHD | 2018 |
DEVELOPMENT AND UPGRADING OF THE PROPOSED PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK - PROPOSED BRIDGE CONDITION ASSESSMENT AND REHABILITATION DESIGN OF 46 NUMBERS OF BRIDGES STRUCTURES AT EXISTING FOUR LANE DUAL CARRIAGE WAY (RED LINES) AND OVERTAKING LANE (OTL) | LEBUHRAYA BORNEO UTARA SDN BHD | 2018 |
NEW PANTAI EXPRESSWAY (E10 : NPE) GENERAL INSPECTION OF BRIDGES ALONG NEW PANTAI EXPRESSWAY YEAR 2018 | NEW PANTAI EXPRESSWAY SDN BHD | 2018 |
AMPANG-KUALA LUMPUR ELEVATED HIGHWAY ("AKLEH") I. PREPARATION OF CRACK REPAIR AT PIER WE57 II. INSPECTION, ASSESSMENT AND REPAIR / STRENGTHENING OF JTR 1/9 III. INSPECTION AND PROPOSAL FOR REPAIR OF CRACKS AT ANCHORAGE BLOCK INSIDE BOX GIRDER ("SERVICES") | TURNPIKE SYNERGY SDN BHD | 2018 |
bottom of page

