top of page
LIST OF PROJECTS
Filter by Nature of Works
SHOWING 304 NUMBERS OF PROJECTS
PROJECT NAME | CLIENT | YEAR |
|---|---|---|
MEMPERKUKUH TIANG SOKONGAN BARU BAGI JAMBATAN SEDIA ADA DI PULAU MELAKA, KOTA BHARU | SYSTEM BUILDERS MAINTENANCE SERVICES SDN BHD | 2017 |
PROPOSED DESIGN AND REMEDIAL WORKS FOR FAULTY VIADUCT DECK BEARING AT P9/12, P9/19, P9/22, P10/2, P10/25 OF KELANA JAYA LINE, FAULTY VIADUCT DECK BEARING AT P180 AND P181 OF AMPANG LINE AND CRACKED PIERS AT P7/11, P8/15, P10/24 AND P21/7 OF KELANA JAYA LINE | STRUCTURAL REPAIRS (M) SDN BHD | 2017 |
LEBUHRAYA SUNGAI BESI - GENERAL INSPECTION ALONG BESRAYA HIGHWAY - YEAR 2016 / 2017 | BESRAYA (M) SDN BHD | 2017 |
AMPANG - KUALA LUMPUR ELEVATED HIGHWAY (AKLEH)-INSPECTIONS WORKS INSIDE THE BOX GIRDERS ALONG AMPANG - KUALA LUMPUR ELEVATED HIGHWAY FOR PROJEK LINTASAN KOTA SDN BHD | TURNPIKE SYNERGY SDN BHD | 2017 |
LEBUHRAYA SUNGAI BESI (BESRAYA) BRIDGE TILTING AND CRACK MONITORING AT PIER 18 BRIDGE E9 003/23 ON (RAMP B), PIER 4 BRIDGE E9 015/10 NB (BRIDGE AT SALAK SELATAN) AND PIER 2 BRIDGE E9 015/10 SB NB (BRIDGE AT SALAK SELATAN) | BESRAYA (M) SDN BHD | 2017 |
KAJIAN CONDITION SURVEY BAGI PROJEK : MEMBINA JALANRAYA SIMPANG PULAI-LOJING-GUA MUSANG-KUALA BERANG PAKEJ 6A: DARI ARING KE SEMPADAN KELANTAN/TERENGGANU | JABATAN KERJA RAYA | 2017 |
NORTH-SOUTH EXPRESSWAY CENTRAL LINK CONDITION ASSESSMENT OF VIADUCT TO PUTRAJAYA BRIDGE (96 SPANS) KM P5.7 BOTH BOUND NORTH-SOUTH EXPRESSWAY CENTRAL LINK, INCLUSIVE OF SUPERVISION ON SITE INVESTIGATION AND NON DESTRUCTIVE TESTING WORKS, SECTION C6 | HSS INTEGRATED SDN BHD | 2016 |
AMPANG-KUALA LUMPUR ELEVATED HIGHWAY (AKLEH) FULL-TIME SUPERVISION FOR THE CRACK REPAIR WORKS AT SELECTED PIERS/ABUTMENTS ALONG AMPANG-KUALA LUMPUR ELEVATED HIGHWAY FOR PROJEK LINTASAN KOTA SDN BHD | TURNPIKE SYNERGY SDN BHD | 2016 |
E25 - LEBUHRAYA KUALA LUMPUR-KUALA SELANGOR (LATAR) BRIDGE INVENTORY AND CONDITIONS INSPECTION TRAINING FOR KL-KUALA SELANGOR EXPRESSWAY BERHAD | KL-KUALA SELANGOR EXPRESSWAY BERHAD | 2016 |
PROPOSED CONSTRUCTION AND COMPLETION OF THE KPC PORT LINK ROAD IN KUANTAN PORT CITY, PAHANG DARUL MAKMUR FOR THE EAST COAST ECONOMIC REGION DEVELOPMENT COUNCIL (ECERDC) - PACKAGE 3A - ELEVATED INTERCHANGE AT GEBENG BYPASS AND DUAL CARRIAGEWAY ROAD FROM CH 5600 TO CH 9500 - STRUCTURAL INTEGRITY TEST TO EXISTING BRIDGE | AHMAD ZAKI RESOURCES BERHAD | 2016 |
INSPECTION OF TWO BRIDGES AT SETIA ECO GLADES CYBERJAYA BRIDGE INTERCHANGE CROSSING PUTRAJAYA LINK HIGHWAY BETWEEN KM 4.0 TO KM 4.9 | SETIA ECO GLADES SDN BHD | 2016 |
CADANGAN MEMBAIKI KEROSAKAN STRUKTUR TIANG JAMBATAN (PIER COLUMN) DI JAMBATAN SUNGAI TOK MOLOR, DAERAH KUALA TERENGGANU, TERENGGANU | SYSTEM BUILDERS MAINTENANCE SERVICES SDN BHD | 2016 |
bottom of page

